  • DHA Quetta Sector A3 Growth and Building Update

    Development efforts at Early Bird Sector A3 in DHA Quetta have gained momentum, turning conditions from early 2024 into a far changed project landscape. A visual comparison between those early months and current progress shows fast transformation across residential, commercial, civic, and utility sectors, supporting steady advancement toward delivery.

    Extensive earthmoving and ground preparation formed the foundation of this progress. Major leveling and heavy machinery operations reshaped rugged terrain into organized road networks and clearly defined development zones. A significant engineering accomplishment was the backfilling of the Sara Khullah Nullah, which crossed deep natural ravines and allowed expansive, stabilized land to be prepared for future construction and transit connections.

    Residential work has advanced quickly. The signature houses moved from bare foundations to completed modern multi-level homes. In addition, structural work on the 44 Executive Villas continued steadily, with masonry walls, framing, and planned plots taking shape.

    Commercial development has kept pace. Thirteen commercial plazas are under construction, with multi-story concrete frames and grey structures visible along main sector routes. Financial services are available on site, including the operational Bank Alfalah branch and its active ATM.

    Civic and educational work is part of the plan. The CSL Meta Robotics Containerized School stands in place, with modular facilities and a central campus green. Recreational amenities are expanding, highlighted by a landscaped zoo and aviary complex with finished walking paths and lit nighttime grounds.

    Infrastructure and utilities remain key. Overhead and underground water storage systems have been established. Innovative planning placed modern administrative offices inside the overhead water tank structure, creating workspaces, meeting rooms, and service counters. Road networks and major transit routes are progressing through the Sector A3 bridge, which includes deep piling, steel rebar reinforcement, and bridge piers. Complete electrification across Early Bird sectors has lit main boulevards and sector streets, creating a bright functional network accessible through the Jinnah Entrance.

    Contact information
    Name: Choudry Mujahid Yasin ( CMY )
    Phone: +923224929992 Whatsapp Available

  • One Central DHA Lahore: — smart Flood Mitigation System

    Designed to redefine benchmarks in urban development, the project incorporates forward-thinking features that combine open environment aesthetics, pedestrian-friendly pathways, and advanced utility management. Among the core highlights of One Central DHA Lahore is its generous allocation of land to environmental design, dedicating 27 percent of the project area to open spaces.

    Alongside these expansive green and open grounds, the development features broad walks designed to encourage walkability and ease of movement throughout the area. Complementing the physical layout is an integrated smart network system, engineered to modernize community operations and infrastructure oversight.

    Beyond its urban amenities, what truly differentiates One Central DHA Lahore is its specialized focus on flood mitigation through rainwater harvesting. During the execution and development of the site infrastructure, water management has been given prioritized attention to protect the area from monsoon challenges and heavy downpours.

    The flood mitigation mechanism operates through a systematic water harvesting and drainage cycle that begins as soon as rainfall occurs: 1. Surface Run-Off Collection When rain falls over the project, surface run-off is promptly captured through a comprehensive network of storm water drains, preventing water accumulation on streets and public walkways.

    2. Diversion to Harvesting Tank From the storm drainage lines, the collected rainwater is routed directly into an on-site rainwater harvesting storage tank, centralizing excess run-off for controlled management.

    3. Power and Pumping Activation To manage the storage levels effectively, dedicated generators and Variable Frequency Drives (VFD) are switched on to supply power to the heavy-duty pumping system.

    Once energized, the pumps activate to draw the stored water out of the harvesting tank. 4.

    Controlled Water Discharge The extracted storm water is directed away from the development and discharged into the Rohi Nala / Charrar Drain. This coordinated flow efficiently disposes of surplus volumes without burdening the local community roads.

    Through this integrated rainwater harvesting and drainage system, One Central DHA Lahore actively manages excess rainwater, substantially mitigates flood risks, and safeguards community infrastructure to ensure smooth, uninterrupted operations under diverse weather conditions. One Central DHA Lahore is progressing rapidly toward completion, introducing modern master planning and infrastructure standards.